Office fit-out and commercial renovation cost in Singapore
Renovation Costs / 2026

Office fit-out and commercial renovation cost in Singapore

Illustration - office reception with timber counter and glass meeting room

In this guide

Planning a renovation?

See the scope of our renovation services.

The short answer

Commercial fit-out in Singapore is priced per square foot, and the published 2026 ranges run from around S$50 for a basic office to S$300 and above for a premium headquarters. The number that matters more is the landlord’s rent-free period, because every week over it is rent paid on a space you cannot use.

Published per-square-foot ranges

Figures below are the clusters across 2026 guides from fit-out firms and consultants. Tier definitions vary between sources, so compare scope lists, not labels.

TierTypical range (S$ per sq ft)What it usually includes
Basic50 to 100Drywall partitions, carpet tiles, basic lighting, minimal joinery
Mid-range80 to 180Glass partitions, pantry, meeting rooms, reception joinery, upgraded lighting and data
Premium150 to 300+Bespoke joinery throughout, integrated AV, complex M&E, feature ceilings
Reinstatement at lease end15 to 20 common; 8 to 40 across sourcesStrip back to bare, make good, per the landlord’s checklist

Cushman & Wakefield’s regional benchmark puts Singapore at the top of Southeast Asia for fit-out cost, around US$140 per square foot on average. Retail, salon and F&B spaces are priced the same way but with heavier joinery, plumbing and ventilation, so they tend to sit in the mid to premium bands.

 

What the landlord will require

  • A fit-out submission with drawings, usually to the building management or MCST, before any work starts
  • A renovation deposit and contractor insurance
  • Restricted noisy-work hours, typically daytime weekdays in offices and malls, so hacking and drilling happen after hours
  • Use of the designated loading bay and debris route
  • A reinstatement checklist that defines what “bare” means at the end of the lease
  • For a change in use of the premises, URA change-of-use approval; for F&B and some retail, SCDF and licensing clearances that add one to three weeks

 

Timeline

Published guides put commercial projects at roughly four weeks for a simple office to over twelve for a complex F&B outlet, excluding authority clearances. Landlords typically give one to three months rent-free. The fit-out programme should be built backwards from your opening date, and joinery fabricated in parallel with site works so it arrives when the site is ready. That is the practical advantage of a contractor with its own workshop.

 

Where the money goes

  • Joinery and counters. Reception, pantry, storage walls, display shelving and treatment rooms. Built in-house at our workshop.
  • Partitions and ceilings. Glass is the premium; drywall is the base.
  • M&E. Electrical, data, lighting, air-conditioning changes and, for F&B, exhaust and fire protection.
  • Flooring. Carpet tile, vinyl, or tile depending on use.
  • After-hours labour. Where the building requires it, priced into the quote so there are no surprises.

Send us your floor plan. WhatsApp +65 8700 1377 with the floor plan and a short brief. We reply Monday to Friday, 9am to 6pm, and quote line by line after a site visit.

Common questions

Yes. Ask for it as a separate line at the start so the end-of-lease cost is known on day one.

Yes, where the building requires it.

We prepare the drawings and documents and submit with you.

Planning a renovation?

See the scope of our renovation services.

Keep planning

Landed homes

Landed property renovation cost in Singapore: interior works to A&A

Published ranges by scope Larry Contractors’ 2026 landed cost guide gives these planning ranges for…

Read guide

Condominiums

Condo renovation cost in Singapore: new and resale units in 2026

Published ranges Qanvast’s 2026 projection, from 2025 medians across 254 new and resale condominium projects…

Read guide

HDB resale

HDB resale renovation cost in Singapore: what to budget in 2026

Published ranges by flat type Qanvast published its 2026 projections in February 2026, built from…

Read guide