Landed property renovation cost in Singapore: interior works to A&A
Renovation Costs / 2026

Landed property renovation cost in Singapore: interior works to A&A

Illustration - landed house dry kitchen island with wet kitchen behind glass doors

In this guide

Planning a renovation?

See the scope of our renovation services.

The short answer

A landed renovation is priced by scope, not by room count. An interior refresh of a typical terrace is a very different job from one that moves walls, and both are different again from additions and alterations that need a qualified person and BCA approval. Know which of the three you are doing before you compare any numbers.

Published ranges by scope

Larry Contractors’ 2026 landed cost guide gives these planning ranges for a typical terrace of about 2,000 square feet:

ScopePlanning range (S$)
Interior only: finishes, kitchen, bathrooms, carpentry, no layout change80,000 to 150,000
Interior with layout changes: hacking, rewiring, new ceilings200,000 to 350,000
A&A or gut-and-rebuildfrom 400,000; over 800,000 for large detached homes
Rear extension of about 300 sq ft (structure only)60,000 to 90,000 plus QP fees
QP fees where BCA approval is needed8,000 to 25,000, plus submission and inspection fees

Innovation Workshop takes on the first two scopes as the interior contractor. Where a project includes structural or exterior works, those are carried out through our partners, and we coordinate the interior fit-out with that programme.

 

Which works need BCA approval and a QP

  • Needs approval and a qualified person (architect or engineer): altering load-bearing walls, columns or beams; adding floor area such as extensions, extra storeys, attic conversions or basements; changing the roof structure; façade changes; major M&E changes such as relocating the water tank or exceeding electrical capacity.
  • Does not need approval: flooring, painting, cabinetry and carpentry, bathroom fittings, minor non-structural partitions. This is most of what a whole-house interior renovation is.

 

Where the money goes in a landed interior

  • Carpentry across every floor. Kitchens, walk-in wardrobes, study rooms, storage walls, staircase cladding and feature walls. On a landed house this can run to dozens of pieces, which is why we build them in our own workshop to one finish standard.
  • Bathrooms. Three to five, each with waterproofing, tiling and sanitary ware.
  • Wet and dry kitchen. Two kitchens is common and both carry plumbing, electrical and cabinetry.
  • Flooring. Large areas, often with a change of material between floors.
  • Electrical. Older houses need a new DB and circuits; multi-storey wiring runs are long.

 

Phasing a landed renovation

Because our quotations are itemised room by room, landed owners often phase the work: ground floor and kitchen first, bedrooms later. Wet works and rewiring should be done once, in the first phase. Carpentry can follow floor by floor.

Explore our landed renovation service →

Send us your floor plan. WhatsApp +65 8700 1377 with the floor plan and a short brief. We reply Monday to Friday, 9am to 6pm, and quote line by line after a site visit.

Common questions

Structural and exterior works are carried out through our partners with the appointed QP. We handle the interior and coordinate with that programme.

Only as a sanity check. Published interior rates run from roughly S$37 to over S$84 per square foot depending on grade, but bathrooms, kitchens and carpentry dominate the bill and do not scale with floor area.

For an interior-only job, sometimes, floor by floor. For layout changes, rarely.

Planning a renovation?

See the scope of our renovation services.

Keep planning

Condominiums

Condo renovation cost in Singapore: new and resale units in 2026

Published ranges Qanvast’s 2026 projection, from 2025 medians across 254 new and resale condominium projects…

Read guide

HDB resale

HDB resale renovation cost in Singapore: what to budget in 2026

Published ranges by flat type Qanvast published its 2026 projections in February 2026, built from…

Read guide